By Jai Warner
•
14 Feb, 2020
This 152 lot subdivision involved the construction of roadworks, sewer drainage, stormwater drainage, town water supply, bio-retention, retaining walls and earthwork designs.The design work included the requirements for a sewer pump station and rising main which was designed to cater for around 450 residents . The second stage of this subdivision which will include the remaining 100 blocks will soon go out to tender. Reid Consulting Engineers undertook all design and supervision, completed project management during construction and the soil testing requirements for the project together with the completion of as-constructed surveys was undertaken by our in-house surveying and soil testing staff.